Home ProductsUpward Casting Machine

Upcasting Copper Rod Machine 8000mt Yearly Capacity 7920H Working Hour

Good services and efficient works,I'd like to cooperation with them, it's my best eyes in china.

—— Raymond

Your goods are prefect in quality compared with those of other manufacturers.

—— Mr. Anil

I'm Online Chat Now

Upcasting Copper Rod Machine 8000mt Yearly Capacity 7920H Working Hour

Upcasting Copper Rod Machine 8000mt Yearly Capacity 7920H Working Hour
Upcasting Copper Rod Machine 8000mt Yearly Capacity 7920H Working Hour

Large Image :  Upcasting Copper Rod Machine 8000mt Yearly Capacity 7920H Working Hour

Product Details:
Place of Origin: China
Brand Name: E&V
Model Number: SYJ1608-I3
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Packaging Details: standrad packing
Delivery Time: 60 DAYS
Supply Ability: 1SET PER MONTH
Detailed Product Description
Color: Optional Yearly Capacity: 8000mt
Function: Producing Copper Rod Strand Qty: 16
Product: 8mm Copper Rod Working Hour: 7920H
High Light:

continuous casting machines

,

Vertical Casting Machine

,

Upcasting Copper Rod Machine 8000mt

 8-20mm 1000-12000tons Upcasting Copper Rod Manufacturing Machine

Introduce:

Upcasting Copper Rod Manufacturing Machine  is used to produce the long and bright oxygen-free copper rod. The induction melting furnace melt the copper cathode into liquid, the liquid keeps off the air by charcoal or graphite flake in case of be oxidation. The holding furnace keeps the copper liquid temperature in 1150℃±10℃, the casting machine crystallizes the copper liquid in crystallizer quickly, then continuously produces copper rod, then the final product will be finished through the double head take up machine and other accessory equipment.

 Main Parameter :             

No. Item Data
1 Model No SYJ(02-24)**(08-35)-I2/3
2 Annual capacity 1000-12000tons
3 Furnace structure 3 body (2 melting,1 holding )
4 Casting Strands 2-24
6 Casting rod diameter: Ф8mm-Ф35mm
7 Upward casting speed 0~3000mm/min or 0-1500mm/min
8 Annual working time 7920hour
9 Liquid tracking precision ±2mm
10 Take-up coil standard Ф700mm × Ф1500mm× 800mm
11 Copper melting velocity 260-2525kg/h
12 Copper melting power consumption <350kwh/ton
13 Take-up form automatic adjust
14 Take-up plate driven approach inverter motor, PLC control
15 Material feeding method whole piece of electrolytic copper cathode fed by electric hoist
16 Upward driven approach driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet
17 Rod clamping method air clamping or manual clamping

 

Why Choose Us?

a. We have experienced team and high-tech equipments.

b. Our machine is good of quality .

c. We can make product according to your requirements.

d. We can offer you very competitive price.

e. You can get expert guides from us all the time.

f. we have perfect service,timely customer response

 

Delivery:

1. Delivery time: 60 working days after the complete receipt of the deposit.

2. The buyer bears the equipment transportation and insurance costs; the buyer provides

unloading tools and bears the unloading costs.

3. When the equipment arrives at the buyer's site, the buyer should check the goods, sign written receiving records, and confirm the consistency between the goods and the lists of shipment.

 

 

Welcome to contact us !!

Contact Details
SHANGHAI E&V IMPORT AND EXPORT CO.,LTD

Contact Person: Cherry

Tel: +8613957382707

Send your inquiry directly to us (0 / 3000)