Home ProductsBrass Casting Machine

Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven

Good services and efficient works,I'd like to cooperation with them, it's my best eyes in china.

—— Raymond

Your goods are prefect in quality compared with those of other manufacturers.

—— Mr. Anil

I'm Online Chat Now

Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven

Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven
Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven

Large Image :  Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven

Product Details:
Place of Origin: China
Brand Name: E&V
Model Number: SYJ2017-I3
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Packaging Details: standrad packing
Delivery Time: 60 DAYS
Supply Ability: 1SET PER MONTH
Detailed Product Description
Yearly Capacity: 10000mt Product: Brass Rod
Working Hour: 7920h Strand NO.: 20
Take-up Coil Standard: φ700mm × φ1500mm × 800mm Copper Melting Velocity: 1270kg / H
High Light:

Brass Casting Machines

,

Brass Casting equipment

,

Brass Rod Continuous Caster Manual Adjusting

Ф17mm - Ф30mm Brass Rod Continuous Caster Manual Adjusting Take - Up Plate Driven

 

 

Main Para-meter

 

 

1 Model: SYJ2017-I3
2 Yearly capacity: 10000mt
3 Furnace structure: 500type three- body furnace (2melting furnace, 1 holding furnace)
4 Casting strands: 20
5 Casting diameter: Ф17mm → Ф30mm
6 Casting speed: 0 ~ 1000mm / min
7 annual working time: 7920h
8 Liquid tracking precision: ± 2mm
9 Take-up coil standard: φ700mm × φ1500mm × 800mm
10 Copper melting velocity: 1270kg / h
11 Copper melting power consumption: <350kwh / ton
12 Take-up form: automatic adjust
13 Take-up plate driven approach: pushed by rod, manual adjusting
14 Material feeding method: whole piece of electrolytic copper cathode fed by electric hoist
15 Upward driven approach: driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet
16 Rod clamping method: manual clamping
17 Operation interface: date display, servo motor controlled by touch screen
18 Total power: 500KW AC three-phase 380V

 

 

some questions for this machine, maybe u are interested in

 

1. How many hours did upcasting machine work yearly?
Generally speaking, the working time is 7920 hours. But we advise the machine should work all year, because it can reduce the wastage.

2. How can we add the material to the furnace?
The whole piece of electrolytic copper cathode board fed by electric hoist. It will be more easier and safe.

3. What's the type of take-up machine?
Fine rod automatic winding, thick rod passive winding and whole automatic winding.

4. Which is the controlling method?


Frequency variation speed control,automatic taking-up and coiling, Intermittent automatic winding,copper rod coiled by pushing and Frequency variation speed control,automatic taking-up and coiling.


 

Welome to contact us

Contact Details
SHANGHAI E&V IMPORT AND EXPORT CO.,LTD

Contact Person: Cherry

Tel: +8613957382707

Send your inquiry directly to us (0 / 3000)